SOLWYRX FAQ: Ordering SOTAR, Sizes, Build Times, Shipping and More
Straight answers on ordering SOTAR boats, raft sizes, build times, Sawyer gear, packrafts, shipping and repairs.
How to Order a Custom SOTAR Raft (and Get Help Designing It)
Three ways to get a SOTAR through SOLWYRX, raft options for solo and two-person trips, and one-on-one help designing a boat for creeks or big water.
Made-to-Order Sawyer Paddles: How Long the Wait Really Is
Sawyer paddles are made to order: Sawyer quotes 1–2 weeks to prepare most orders plus ground transit, and through SOLWYRX plan on 2–8 weeks.

